Previous                     Index                        Next
Surfaces    
The shower installed. A shower head and a hand-held. Small issue here with the diverter valve but we'll get that sorted out soon. Next step here is the glass door and the glass partition between the shower and tub. Also, now that the tub is in we can get the entry door to the bathroom installed. And when that is done... the temporary walls (aka, the bat cave) come down!
The shower installed. A shower head and...