Previous                     Index                        Next
Surfaces    
The bathroom tiling is just about done except for one sliver between the linen shelves and the shower entry. The plumber will be back the week of 5/5 to install all of the fixtures. We should have a working bathroom by the end of that week!
The bathroom tiling is just about done...