Previous                     Index                        Next
Roof/Glass    
Morning after plywood inspection. From 8 feet into the garage all the way to the east end of the house is a continuous shear wall at ground level. Also, all of the holes for the windows are cut, and both wing-walls are in. Framing to support the lights which go in the great room overhang is in. One of the big living room windows can be seen at the right.
Morning after plywood inspection. From 8...