Previous                     Index                        Next
Concrete    
Now, while Whitlow and JMR are busy out front, the pressure is on around back. We were going to try to get the L-footing from the laundry room floor to the retaining wall poured. Problem is, this giant 1 1/8 inch by 10 foot allthread needs to be cut in half to make two huge bolts which go from about 2' into the footing, through the floor beam and up into an engineered wall. Here, Valente cuts the bolt.
Now, while Whitlow and JMR are busy out...