Previous
                   
Index
                      
Next
 | 
Excavation    
 | 
| 
A closeup of a  moment frame assembly. The group of 4 bolts in the background will hold the I-beam down. In the foreground, these bolts are for a Hardy frame pre-fab metal shear wall. Strucural engineer Josh really went  to town on the rebar...
 | 
 
 |