Previous
                   
Index
                      
Next
 | 
Excavation    
 | 
| 
Out back, the footings for the tree house are caged up. That's quite the block of concrete and steel at the corner. It's about 4' on a side and 5' deep. If you zoom in and look at the connections to the existing foundation, you can see  grey spots of epoxy.
 | 
 
 |