Previous                     Index                        Next
Demolition    
Under the house, the island post is replaced by a piece of the old garage carrying beam so that the floor can be poured. Also, the trench for the toe of the retaining wall is nearly done. The drain pipe and other plumbing will move soon.
Under the house, the island post is...